Crane case studies

[30 September 2008] Synchronized crane wheels cut maintenance costs

The retrofit of this portal crane at concrete manufacturer MBI Beton BV involved replacing the controls as well as the drive motors. Emotron provided a complete solution which requires less maintenance thanks to minimal wheel wear.

/applications-industries/case-studies/cranes/mbi-beton-crane-modernization-case1/
[28 February 2008] Crane modernization with optimized grabber control

Emotron modernized this dockside crane in Hildesheim, Germany, in only 14 days. The customer now disposes of an up-to-date crane with optimized grab control, and will benefit from reduced costs thanks to minimized maintenance.

/applications-industries/case-studies/cranes/optimized-grab-control-case1/
[22 August 2007] Crane modernization reduced maintenance and increased user-friendliness

The cranes at the Bleiloch pumped storage power plant in Germany have undergone a comprehensive modernization after 75 years of operation.

/applications-industries/case-studies/cranes/crane-modernization-bleiloch-case1/